Loading question...
You are in free guest mode. Timed Practice Revision List Attempt History Progress Tracking Create a free account to unlock these tools
Prev Next
IELTS Practice Reading: Label Diagram ID: #56211 Medium Stadium Australia
Instructions
Drag the right answers.
1 Select text 2 Right-click 3 Highlight or Add Note

Stadium Australia was the most environmentally friendly Olympic stadium ever built. Every single product and material used had to meet strict guidelines, even if it turned our to he more expensive. All the timber was either recycled or derived from renewable sources. In order to reduce energy’ costs, the design allowed for natural lighting in as many public areas as possible, supplemented by solar-powered units. Rainwater collected from the roof ran off into storage- ranks, where it could be tapped for pitch irrigation. Stormwater run-off was collected for toilet flushing. Wherever possible, passive ventilation was used instead of mechanical air- conditioning. Even the steel and concrete from the two end stands due to be demolished at the end of the Olympics was to be recycled. Furthermore, no private cars were allowed on the Homebush site. Instead, every spectator was to arrive by public transport, and quite right too. If ever there was a stadium to persuade a sceptic like myself that the Olympic Games do, after all, have a useful function in at least setting design and planning trends, this was the one.

5 labels
Diagram
Options:
public transport
solar-powered units
mechanical air- conditioning
flushing
natural lighting
storm water
pitch irrigation
two end stands
planning trends
timber
Highlight
Clear Highlight
Clear All Highlights
Add Note
Delete Note
Delete All Notes

With a free account: Retry and compare every attempt.
Saving...