You are in free guest mode.
Timed Practice
Revision List
Attempt History
Progress Tracking
Create a free account to unlock these tools
Practice Reading: Fill in The Blanks (Drag & Drop)
ID: #46718
The real environmental
* Drag the correct answer into all target fields
The real environmental achievement here, however, is the internal design. What you see from the plaza and, in fact, from all comers of London, is a great of steel, aluminium and glass. This is the building's skin. Just behind this is the great steel structure of the building, hidden on dull days, clearly visible when the sun shines. This , devised by the engineers, Arup, is a cage very much like the skeleton of Barnes Wallis's Second World War bombers. Intriguingly. this structure during the day as the building loads up with people and stretches in the evening as it empties. Spiralling up through the internal structure is a sequence of atriums. They are every six floors so that the updraft of air through the building does not become too strong.
structure
sheath
consequences
diagonal
effect
nutrients
interrupted
compresses
Result:
With a free account:
Retry and compare every attempt.
How difficult was this question?
Others found:
100% Easy · 0% Medium · 0% Hard
Saving...