Loading question...
You are in free guest mode. Timed Practice Revision List Attempt History Progress Tracking Create a free account to unlock these tools
Prev Next
Practice Reading: Fill in The Blanks (Drag & Drop) ID: #46718 The real environmental
Instructions
* Drag the correct answer into all target fields
The    real    environmental    achievement    here,    however,    is    the  internal  design.    What    you    see    from    the    plaza    and,    in    fact,    from    all    comers    of    London,    is    a    great    of    steel,    aluminium    and    glass.    This    is    the    building's    skin.    Just    behind    this    is    the    great    steel    structure    of    the    building,    hidden    on    dull    days,    clearly    visible    when    the    sun    shines.    This  ,    devised    by    the    engineers,    Arup,    is    a    cage    very    much    like    the    skeleton    of    Barnes    Wallis's    Second    World    War    bombers.    Intriguingly.    this    structure    during    the    day    as    the    building    loads    up    with    people    and    stretches    in    the    evening    as    it    empties.    Spiralling    up    through    the    internal    structure    is    a    sequence    of    atriums.    They    are    every    six    floors    so    that    the    updraft    of    air    through    the    building    does    not    become    too    strong.

structure sheath consequences diagonal effect nutrients interrupted compresses

Result:

With a free account: Retry and compare every attempt.
How difficult was this question?
Others found: 100% Easy · 0% Medium · 0% Hard
Saving...